BELS Weekly Meeting Running Agenda
-- Main.Rvitale - 25 Aug 2008 -- Main.Suprdave - 06 Mar 2009Announcements
- BELS Staff Meetings - Friday at 11:00am
- BELS Windows hours (Parts and Package Pickup) - 1-5pm try to enforce.
- Remember to put BELS part number on invoices (this is the one to four digit number beneath the barcode)
- Keep packages/receivables moving
Targeted To-Dos this week
- Order lab supplies for for EE080J? (in progress)
- Make parts kits for EE171 (done)
- Make parts kits for CE121 (in progress)
- Cleanup student home directories on Gerber to reclaim disk space (in progress)
- Complete BELS parts inventory (in progress)
- Print and distribute posters for CE185 and SOE Open House (in progress)
Targeted To-Dos next week
- Distribute parts kits to CE100 lab sections on Monday March 9
- Finish CE121 parts kits
- Identify and replace or repair broken Oscope and DMM probes in labs
- Finish poster printing for SOE Open House
- Restore fallen posters from E2 window display
- Organize surplus accumulation in BE016
- Recruit additional student tech to replace Annendra as his available work hours are decreasing
Safety Share
BELS staff share what was done in the past week to promote safe work practices, to proactively reduce hazards and to eduate each other on potential hazards to be aware of. BELSPastSafetyShareNotes 8/20/07 - Christian & Juan - mentioned the freight elevator needs adjustment, floor of elevator does not align with floors (off by several inches). Different when going up & down. When going up the freight elevator floor is too low, when going down the elevator floor is too high. Bob to submit a work request to ask campus facilities to fix. Also asked BELS staff to ensure they have proper safety equipment when entering labs (shoes, safety glasses). Each BELS staff (including students) should have a kit of safety equipment; to include the following:- safety glasses
- yellow hard hat
- gloves
- box of dust masks
- small flashlight
BELS Student Hours Winter 2009
| Student | Monday | Tuesday | Wednesday | Thursday | Friday |
|---|---|---|---|---|---|
| Eric Christensen | 1530-1730 | 1230-1800 | 1530-1730 | 0900-1730 | 1100-1300 |
| Ulysses Morales | 1200-1800 | 1300-1800 | 1100-1800 | ||
| Annendra Lal | 1100-1500 | 1100-1500 | 1100-1500 | ||
Tasks and Status
Training & Development
-
- Parts Kits:
- All parts kits for winter quarter distributed
- Parts Kits:
-
- Update lab equipment database (Ulysses)
-
- Make up TA inventory and orientation sheet (Eric)
- Have them keep track of who takes what
- Include checklist of what's in the lab
- Rules and responsibilities
- Introduce BELS (hours, location, and our role)
- Stock spare parts for EE70/171 in BE150 black cabinet
- Make up TA inventory and orientation sheet (Eric)
-
- HC11 missing Microkits
- 6/27/08 - need to update inventory
- kit 74, Gato Scatena out 11/05/04 (soert 19699)
- kit 98
- kit 99, Drake Silva
- kit 100
- kit 105 - Petersen?
- kit 120
- HC11 missing Microkits
-
-
- Need to email warning(?) - Bob to charge students
-
-
- ILC Requests to make
- Phase 1 lab development plan approved. Purchase additional benches, computers, instrumentation
- ILC Requests to make
-
- Purchases
-
-
- Phase 1 Summer 2008 Goal: increase lab stations, build out existing labs
-
-
- BE161
- purchase 16 Anthro 4-foot benches to replace 12 6-foot benches
- purchase 4 o-scopes/power supplies/DMMs for new benches
- lab station count increases from 12 to 16 seats
- BE138
- move 8 wood block benches from BE161 - purchase 8 o-scopes/power supplies/DMMs for benches
- lab station count increases from 0 to 8 seats
- BE115
- purchase 10 o-scopes/10 arb signal generators, 10 new PCs
- BE113
- purchase 10 new PCs
- BE111
- purchase 10 new PCs plus 1 for image master (total 31 new PCs)
- relocate existing PCs from these labs to BE104 and BE138
- BE161
-
- Investigations
- Point of sale system - Bob give info to Christian
- Investigations
-
- Student Hire Responsibilities
- SOE Wide equipment inventory (Ulysses, Al & Bob)
- Eric and Ulysses to assume receiving tasks, printing posters
- Eric and Ulysses to assume inventory tasks
- Student Hire Responsibilities
Lab Improvements
| Lab | Plan | Actions to Do |
| BE-104 | Upgrade computers | Move 21 computers from Sr. Projects Class |
| BE-111 |
Upgrade computers (new) | 10 New computers, old computers to BE-104 1 additional computer for image |
| BE-113 | Upgrade computers (new) | 10 New computers, old computers to BE-104/138 |
| BE-115 | Upgrade computers (new) | 10 new computers, old computers to BE-104/138 |
| BE-118 |
upgrade computer new w/dual monitor | New computer for poster plotter |
| BE-138 Projects Overflow |
lab station count increases from 0 to 8 seats | woodblock benches from BE-161/16 |
| BE-148 |
-replacement optical equipment | |
| BE-150 | ||
| BE-161 | increase stations from 12 to 16 | -16 new benches |
| BE-162 |
increase stations from 8 to 12 add test equipment to benches |
-12 new benches |
| BE-168 | update computers | -12 Computers |
| Room | New PC | 500MHz Oscope |
Arb | 3-Output Power Supply |
DMM | ||
| Totals | 30 | 30 | 30 | 48 | |||
| BE104 | |||||||
| BE111 | 11 | ||||||
| BE113 | 10 | ||||||
| BE115 | 10 | 10 | 10 | 10 | 20 | ||
| BE118 | 1 | ||||||
| BE138 | 8 | 8 | 8 | 16 | |||
| BE148 | |||||||
| BE150 | |||||||
| BE161 | |||||||
| BE162 | 12 | 12 | 12 | 12 | |||
| BE168 | |||||||
- BE-104
- 21 PCs running WinXP?
- BE-111
- 10 PCs running WinXP?
- BE-113
- 10 PCs running WinXP?
- BE-115
- 10 PCs running WinXP?
- BE-118 [SOEPLOT]
- New PC installed as front end interface for plotter (HairyPlotter? )
- BE-126 [CLOSED]
- Proposed location for calibration lab
- BE-138 [CLOSED]
- Overflow project lab for CE/EE123 winter/spring quarters instead of BE162
- BE-148 [OPTICS]
- BE-150
- 12 PCs running WinXP?
- BE-161
- 16 PCs running WinXP?
- BE-162
- 12 PCs running CentOS?
- Install magnet chiller & remove hoses from sink
- Setup second wafer probe station from packing crate
- BE-168
- 10 fully functional network lab stations, These are on private network
- 10 PCs running WinXP? on SOE network
- Need additional circuit breakers to accommodate additional PCs
- E2-475 [VIDEOCONFERENCING]
- Need power outlets in ceiling for projectors/cameras
- Need blackout curtains/panels to darken room
- Need camera brackets on walls, corner pole by presenters station
- E2-516 [ANTENNAS]
- Need access to roof for antenna connections
- E2-580 [UnderGrad sponsored research]
- 6 PCs running WinXP?
- Propose to remove BELS instrumentation from this lab if not used as overflow lab
- E2-585 [UnderGrad sponsored research]
- 3 PCs running WinXP?
- BELS instrumentation can remain in this lab for support of URNA sponsored student project
- E2-592 [Advanced Networking]
- 1 PC running WinXP?
- Need 208V power outlet installed
- Lab Equipment Matrix
| Description | BE104 | BE111 | BE113 | BE115 | BE138 | BE148 | BE150 | BE161 | BE162 | BE168 | E2 580 | E2 585 | total | |
| Benches | ||||||||||||||
| 6 ft woodblock | 2 | 3 | 3 | 4 | 9 | 2 | 2 | 1 | 12 | 2 | 40 | |||
| 6 ft laminate+shelf | 10 | 10 | 12 | 32 | ||||||||||
| 4 ft anthro | 21 | 1 | 22 | |||||||||||
| 4 ft anthro+shelf | 1 | 10 | 16 | 13 | 40 | |||||||||
| Computers | ||||||||||||||
| Opt260 | 1 | 12 | 10 | 23 | ||||||||||
| Opt270 | 12 | 16 | 28 | |||||||||||
| Opt620 | 21 | 6 | 27 | |||||||||||
| Opt755 | 9 | 10 | 10 | 29 | ||||||||||
| Power Supplies | ||||||||||||||
| Agilent E3631A? | 9 | 8 | 10 | 24 | 16 | 1 | 2 | 70 | ||||||
| Leader LPS151 | 1 | 1 | 2 | |||||||||||
| Multimeters | ||||||||||||||
| Agilent 34401A | 9 | 8 | 10 | 24 | 16 | 3 | 1 | 2 | 73 | |||||
| Fluke 37 | 20 | 20 | ||||||||||||
| Oscilloscopes | ||||||||||||||
| Tek TDS3054 4chan | 9 | 8 | 3 | 3 | 1 | 1 | 25 | |||||||
| Tek TDS3052 2chan | 12 | 13 | 25 | |||||||||||
| Tek 2246 | 5 | 5 | ||||||||||||
| Kikusui C0S5041? | 20 | 12 | 32 | |||||||||||
| Signal Generators | ||||||||||||||
| Agilent 33120A arb | 3 | 5 | 2 | 12 | 1 | 1 | 24 | |||||||
BELS Parts Inventory & Point of Sale System
- Clean up database - student techs
- Still need to do some remapping of catagories ("audio products") -superdave
- Move to actual webserver for testing(?); ask Matthew K.
| Item Category | Cat Sub L1 | Cat Sub L2 | Cat Sub L3 | Cat Sub L4 |
| electronic component | resistor | fixed | carbonfilm | |
| electronic component | resistor | variable | ||
| electronic component | resistor | fixed | surfacemount | size0805 |
| electronic component | resistor | fixed | surfacemount | size1350 |
- Complete Drawer-by-Drawer check of inventory for barcodes and correct info in database (Juan) Also barcode all parts bins.
- Put new hardware into database. verify accuracy of labeling_
Misc.
- Help Bob update webpages
- Rework signout sheet and sales form (include ability to keep a "running tab" for students during the quarter) (Dave) please see attachments Recharge.xls and Student Sales.xls for proposed documents